You can see the last section of bridge being carried away in the distance.
Probably the only time you'll see the creek without 17 bridge
The first bridge pile being driven into the ground. The piles are 16 ft long and driven at least 8 foot.
Below is a link to the pile driver in action
https://www.youtube.com/shorts/G431aVa4MxQ?feature=share