The beginning of repairs on 18 bridge.
Old decking was removed, and existing joists and beams were repaired as needed
The bridges originally had 3 joists or beams running under the deck.
We added 2 additional joists for more strength.
New yellow pine deck boards are down and the crew is installing 6 screws per board.
It took 1584 screws just for # 18
New rails are on and 18 is finally complete!
#14 was mostly the same except for the added fun of working in several inches of water...